How Much Does a Concrete House Cost to Build in 2025?
Leading provider of construction services
The average cost to build a house is $175 per square foot, excluding extras. Total costs vary by property type, size, and custom features. On average, homeowners spend around $413,147 to build a house.
It usually takes 9 months to complete construction, or up to 12 months if done DIY. Additional costs like permits, utility hookups, and design fees can add significantly to the budget.
Material choices and labor also affect the price. High-end finishes and energy-efficient upgrades increase costs but offer long-term value. DIY builds may save money but often extend the timeline and increase risk.

How Much Does It Cost to Build a House?
The typical cost of constructing a house is $175 per square foot. This figure excludes expenses such as land costs, permit fees, excavations, and other related costs.
Cost Breakdown for Building a House:
Description | Cost |
Average Cost per Square Foot | $175 |
Average Home Building Costs | $263,147 |
Minimum (800 sq. ft.) | $140,000 |
Maximum (5,000 sq. ft.) | $875,000 |
Average Range | $200,000 – $500,000 |

Concrete Foundation Cost per Linear Foot
The cost of installation varies depending on the length in linear feet. For instance, for a length of 100 linear feet, you can expect to pay between $1,800 and $2,500 on average. If you’re looking at 125 linear feet, the cost increases slightly to a range of $2,300 to $3,000. Moving up to 150 linear feet, the average cost range expands to $2,500 to $3,500. As you go higher, say 175 linear feet, the average cost range widens to $3,000 to $4,000. Finally, for a length of 200 linear feet, the average cost range increases further to $3,500 to $4,500. These estimates offer insights into the potential costs of installation based on different lengths in linear feet.

Length (Linear Feet) | Average Costs (Installed) |
100 | $1,800 – $2,500 |
125 | $2,300 – $3,000 |
150 | $2,500 – $3,500 |
175 | $3,000 – $4,000 |
200 | $3,500 – $4,500 |
90% More Chances to Win Projects With Our Estimate!
- Multi-Family Building
- Hotel Building
- Hospital Building
- Warehouse Building
- School & University Building
- High-Rise Building
- Shopping Complex
- Data Center Building

Videos For Concrete Construction
Concrete Driveway
Concrete Slab
Concrete Pour
Concrete Block Building Cost
Concrete block costs for building and construction typically range from $1 to $4 per block, with the cost varying based on the size. Standard 8”x8”x16” concrete blocks are priced between $1.25 and $2.50 each. For larger CMU blocks measuring 12”x8”x16”, expect to pay between $2 and $4 per block. These costs may fluctuate depending on factors such as location, supplier, and quantity purchased. It’s essential to consider these costs when planning a construction project using concrete blocks, as they form a significant part of the overall budget.
Average Home Construction Cost Based on Square Footage
Average Home Building Costs Based on Square Footage:
Home Size | Average Price Range |
800 sq. ft. | $140,000 |
1,000 sq. ft. | $175,000 |
1,200 sq. ft. | $210,000 |
1,400 sq. ft. | $245,000 |
1,500 sq. ft. | $262,500 |
1,700 sq. ft. | $297,500 |
2,000 sq. ft. | $350,000 |
2,500 sq. ft. | $437,500 |
3,000 sq. ft. | $525,000 |
4,000 sq. ft. | $700,000 |
4,500 sq. ft. | $787,500 |
Breakdown of Building Costs for a House
To provide a comprehensive view, here’s a breakdown of the costs involved in building a 2,500 sq. ft. house:
1. Material Cost for New Home Construction: $147,500
Where construction is a significant part of the economy, building materials usually account for about 50% of total construction expenses. Plan to allocate approximately $50 per square foot for material costs, although prices can vary depending on factors such as location and demand. It’s important to stay informed about market trends and potential fluctuations in material prices. Additionally, consider factors like environmental regulations and sustainability practices when selecting materials for your home construction project. Below are some material costs to keep in mind when building your home:

Description | Cost |
Material Cost for New Home | $147,500 |
Flooring (per sq. ft.) | $6 – $8 |
Drywall (per sheet) | $1.44 – $1.54 |
Siding (per sq. ft.) | $3 – $15 |
Lumber (per board ft.) | $650 – $110 |
We Provide 3D Rendering Services!
For Stucco and Other Projects
Turnaround time is 1-2 days.
Win More Projects With Us
2. Contractor Charges: 10% – 20%
To oversee the construction process, you’ll need a contractor or contracting firm. A general contractor coordinates various professionals involved in building a home, including electricians, architects, floor installers, plumbers, HVAC installers, and carpenters, among others. Contractors typically charge between 10% and 20% of the total construction cost. This fee varies based on factors like property type, level of detail, materials used, and the size of the workforce. In addition to the contractor’s fee, it’s essential to consider the hourly rates of each professional involved. Here are the average hourly rates for home building professionals:
Professionals | Hourly Rate |
Flooring Installers | $16.58 |
Roofers | $24.44 |
Painters | $19.08 |
Brick Masons | $21.91 |
Landscapers | $16.23 |
General Contractors | $19.32 |
Plumbers | $26.46 |
Carpenters | $21.70 |
HVAC Technicians | $26.39 |
Structural Engineers | $40.55 |
Electricians | $26.75 |
3. Electrical Costs: $7,500 – $12,500
The electrical costs for new construction typically range from $7,500 to $12,500. This expense covers both the rough-in and finishing work, with an average cost of $3 to $6 per square foot. The final amount spent on electrical work varies depending on factors such as property size, type of wiring, and materials used. Some electricians may charge up to $120 per hour for their services.

Business Finance Loan
Find out if you're pre-qualified in seconds

Get Prequalified Now
IMPORTANT: Make sure the email and phone number you enter are correct. We will email and text you a link to get started.
4. Roof Installation Costs: $2,900 – $33,000
The cost of roof installation is influenced by factors such as the chosen material, roof slope, and the size of the home. Below are the average prices per 100 square feet for different roofing materials:
These figures provide an overview of the roofing costs associated with various materials.
Roofing Material | Avg Cost per 100 Sq. Ft. |
Asphalt Shingle Roof | $146.52 – $238.10 |
Tile Roof | $686.81 – $1,098.90 |
Wood Shake Roof | $480.77 – $631.87 |
Slate Roof | $663.92 – $1,648.35 |

These figures provide an overview of the roofing costs associated with various materials.
5. Plumbing Costs: $12,000
Plumbing costs encompass the installation of plumbing fixtures such as toilets, faucets, wash basins, bathtubs, and more. On average, homeowners spend around $4.50 per square foot on plumbing in new construction, totaling approximately $4,080. Plumbing work involves tasks like fixing pipes and laying sewage lines. Additionally, when custom building a home, it’s necessary to install appliances like washing machines, dryers, and geysers.
6. HVAC Installation Costs: $12,500

Homeowners typically budget between $1,500 and $12,500 for installing a new HVAC system. However, this cost can vary depending on factors such as the size of the cooling area, the type of system selected, the brand chosen, and other considerations. These additional factors can potentially increase the HVAC installation cost by $2,000 or more.
Need Template For Your Construction Business
We provide services for Brochure, Banner, Business Card, Envelope, Invoice, etc.

Soft Costs in Home Construction
Soft costs in home construction contribute indirectly to the building process. They encompass expenses such as land costs, permit fees, design fees, and more.
1. Land Costs: $32,800 per Acre
Before embarking on the construction of your house, you’ll need to secure land. There are two main costs associated with land:
- Land Purchase Cost: The average price per acre is $29,800. However, the cost of land can vary depending on factors such as the size of the house you intend to build and its location.
- Preparation Cost: Prior to commencing construction, you’ll need to clear and level the land. Land preparation costs typically range between $1,500 and $3,000.
2. Home Building Permit Costs: $5,000
Obtaining a building permit is a necessary step for contractors to commence construction on a new house. These permits serve as legal documents authorizing the building process. Permit costs and building codes can vary and are typically determined by factors such as construction type, occupancy type, home building area, and project scope. Below are some permits you may require, along with their average costs:
Type of Permit | Estimated Cost Range |
---|---|
Building Permit | $1,000 – $2,000 |
HVAC System Permit | $250 – $400 |
Plumbing System Permit | $50 – $500 |
Electrical Permit | $10 – $500 |

3. Home Interiors: $20,000
Before settling into your new home, you’ll need to furnish it with furniture, electronics, kitchenware, silverware, and bathroom essentials. The total costs will depend on your personal taste, the quality of finishes desired, location, and where you purchase these items. For a 2,500 sq. ft. home, budgeting at least $20,000 for interior furnishings is recommended.
4. Home Interior Designer Costs: $5,400
If designing your home’s interior isn’t your forte, hiring an interior designer is an option. A skilled interior designer can provide 3D views and renderings of your home, assist in selecting furniture, wall prints, rugs, and other decor items tailored to your preferences and needs, and help optimize space utilization. The cost of hiring an interior designer typically starts at $5,400, though it may vary depending on the complexity of your requirements.
Get 5 New Projects in the Next 7 Days With Our System
Conclusion
The cost to build a house in 2024 varies significantly based on numerous factors. On average, the price per square foot is $175, excluding additional expenses. Homeowners typically spend around $413,147 in total for construction. This expense breakdown includes various aspects such as material costs, contractor charges, electrical, plumbing, HVAC installation, and soft costs like land acquisition and permits. It’s crucial for homeowners to carefully consider each component of the building process and budget accordingly. By understanding the costs involved and planning accordingly, individuals can ensure a smoother and more successful home construction journey.
Frequently Asked Question
The average cost to build a house is approximately $175 per square foot, excluding additional expenses such as land costs, permit fees, and customizations.
The construction timeline for building a house typically ranges from 9 to 12 months. However, if you choose to DIY without hiring a contractor, it may take up to 12 months.
Hard costs include expenses directly associated with the home-building process, such as material costs, contractor charges, electrical, plumbing, and HVAC installation costs.
The average home building costs vary based on square footage, ranging from $140,000 for an 800 sq. ft. home to $787,500 for a 4,500 sq. ft. home.
Homeowners typically spend around $413,147 in total to build a house, considering all the associated costs.

Testimonials
What Our Clients Say
We take pride in delivering accurate, timely, and reliable estimates that help contractors and builders win more projects. Our clients consistently praise our attention to detail, fast turnaround times, and the positive impact our estimates have on their businesses.
Estimate Florida Consulting has helped us win more bids with their fast and accurate estimates. We trust them for every project!

Steps to Follow
Our Simple Process to Get Your Estimate
01
Upload Plans
Submit your project plans, blueprints, or relevant documents through our online form or via email.
02
Receive Quotation
We’ll review your project details and send you a quote based on your scope and requirements.
03
Confirmation
Confirm the details and finalize any adjustments to ensure the estimate meets your project needs.
04
Get Estimate
Receive your detailed, trade-specific estimate within 1-2 business days, ready for your project execution.