Commercial Building Cost Estimator

The Estimate Florida Consulting can meet all of your commercial building cost estimating needs in the Florida area, as well as throughout the United States. We have experience in all aspects of the market including high and low residential buildings, commercial, industrial, shopping malls, health care projects, civil drainage projects, and infrastructure works.

Our building estimators are here to provide fast and accurate investigations to ensure their customers can submit an accurate and competitive price estimate. All designs are measured using a neat screen system that provides high accuracy.

Commercial Building Cost Estimator

Frequently Asked Questions ( FAQs)

The average commercial construction cost in the United States is around $520 per square foot. However, the price can range from as little as $80 to over $1,300 depending on the building type and location.
 

Upload Plan

Get a FREE estimate for your project 

A 50,000 sq ft steel warehouse costs between $640,000 and $980,000, depending on its design, inventory type, location, and steel prices. However, to ensure future profits for the warehouse, you must also consider the warehouse’s soft and long-term expenses.

Get a FREE estimate for your project

Upload Plan

The average cost to build a house is $248,000, or between $100 to $155 per square foot depending on your location, size of the home, and if modern or custom designs are used. New home construction for a 2,000 square foot home runs $201,000 to $310,000 on average.

Most commercial buildings that are more than 10,000 square feet will take somewhere between 4-6 months to build. When you get up into more complex office buildings and larger industrial buildings, say 50,000 square feet or more, they can take from six to eight months.

Get a FREE estimate for your project

Upload Plan

At Estimate Florida Consulting, we aim to provide a complete range of mechanical cost estimating services to assist our clients in winning mechanical construction bids and increasing their net profits. With years of experience, expertise, and use of the latest technology, our building cost estimators have delivered highly accurate and on-time estimates for projects ranging from thousands of dollars to billion-dollar evaluation.

Our professional construction estimators are highly experienced and trusted ones. We work with ZIP code tracking to prepare an accurate estimate report for labor and material estimates.

Our in-house construction estimating service helps to understand the detailed estimate report. 

Request sample project & Portfolio

Check out our sample project, Budgeting/Take Off and the way we present our services. 

Fill in the form and we’ll send you immediately!

Click here

How To Estimate Commercial Building Construction Costs?

Not all types of commercial construction are created equal, as the costs of building vary from one location to another. For instance, the square foot costs for commercial construction in the United States can change depending on the city – for example, New York would be several times higher than a project in Detroit or Atlanta.

Commercial Construction Cost Per Square Foot

The location of commercial electrical installation affects the cost of the project.  The median construction cost ranges from $380 per square foot for small installations. Prices can go up to $480 per square foot for a big city. Below is a table showing the construction cost ranges of different commercial buildings.

BUILDING TYPECOST PER SQUARE FOOT
Single story office$311-$377
Mid-Rise Office$650-$750
High-rise Office$698-$838
Neighbourhood Stipe Mall$320-$380
Regional Mall$460-$1572
Three Star Hotel$498-$618
Recreation/ Gymnasiums$367-$693

Check out the video

Google Reviews

Patio Pools and Driveways
Patio Pools and Driveways
"Came to recuse and took care the project from start to finish"
Read More
I used their services for estimation. I am really impressed with their services. Thank you for your good service.
6 Star Constructors
6 Star Constructors
"Came to recuse and took care the project from start to finish"
Read More
I used their services for estimation. I am really impressed with their services. Thank you for your good service.
Marvelous Marble Restoration
Marvelous Marble Restoration
"Came to recuse and took care the project from start to finish"
Read More
I used their services for estimation. I am really impressed with their services. Thank you for your good service.
Previous
Next
  • Building Quality

    Commercial buildings have different quality elements that influence the cost. The type of wall and roofing, for instance, would determine whether a building falls under class A, B or C. Average commercial construction costs would also depend on the quality of infrastructure laid in them.

  • Design & Architecture

    Shape classifications also affect the overall cost of commercial building construction. Reduction in floor area and outside wall area, for instance, reduces the construction cost per square meter. A high rise building would cost more than a single story office building, for example. The simplistic design of a convenience store, on the other hand, would mean that it’s less expensive to construct than a bank tower. The more complex an architectural design is, the higher the commercial construction per square foot cost. That’s because you need more general contractors and materials to bring the project to completion.

  • Labor

    Building projects outside metropolitan areas can result in cost savings from anywhere between 2% to 6% than those in the heart of the city. The cost per square foot varies because of cheaper labor and associated factors. On the other hand, construction done in adverse weather conditions or after a flood or hurricane can temporarily increase types of construction costs by 25% to 50%.

  • Construction materials

    Expenses here include the costs of the materials, taxes and shipping charges. Construction materials include bulk materials, standard off the shelf materials, and fabricated members. In the construction industry, it’s commonly understood that skyscrapers have high commercial construction costs per sq ft because of the amount of materials that they require. Because they’re commonly steel buildings with expensive aesthetics, the costs can go up even more if their complexity increases.

  • Permits

    Calculations for new commercial building construction costs should also factor in permit fees. The cost of permits depends on the location of the construction project and the type of work to be undertaken on site. Permits are often calculated using local fee schedules.

  • Mechanical systems (HVAC)

    Every building owner wants enhanced comfort and efficiency on their property. In commercial properties, for instance, mechanical systems are a must-have, including air conditioning, heating, and cooling, plumbing and energy elevator fixtures. Involving mechanical and electrical contractors early on in the design stage can help to minimize errors and promote cost effective practices.

  • Electrical systems

    Electrical installations in a commercial building must meet the requirements of the National Electrical Code. Compliance with NEC stipulations doesn’t, however, lead to automatic energy efficiency. Expert design insights are needed at an early stage to achieve energy efficiency and reduce commercial construction building costs.

  • Delivery

    Bulk materials such as gravel entail high delivery costs which can drive up the overall project estimate. Other materials such as piping and valves fall under standard off-the-shelf materials, which means the delivery process isn’t too complex or pricey. The cost of fabricated materials, on the other hand, would depend on whether they are fully or partially fabricated before shipping. So when it comes to estimating construction costs for commercial buildings, you must take into account delivery factors too.

5/5

Why Choose Us

Process To Get Commercial Building Estimate Report

Here I am going to share some steps to get your commercial building estimate report.

  • You need to send your plan to us.

    You can send us your plan on info@estimatorflorida.com

  • You receive a quote for your project.

    Before starting your project, we send you a quote for your service. That quote will have detailed information about your project. Here you will get information about the size, difficulty, complexity and bid date when determining pricing.

  • Get Estimate Report

    We do commercial building estimating and prepare a detailed report for your project. At last you finalize the report and finish the project.

Contact Us