Condo replacement in Florida averages $325-$575 per square foot in 2026 for complete structural rebuilds, with typical 1,400-1,800 sf 2/2 units costing $455K-$1.04M and mid-size 100-unit towers reaching $50M-$90M factoring FBC-mandated impact glazing, post-Surfside balcony reconstruction, and Miami-Dade HVHZ wind engineering driving coastal premiums. Pompano Beach HOAs budget $375-$625/sf for 12-18 story concrete structures requiring 2-hour fire-rated corridors, epoxy-coated rebar for salt-air corrosion, and NOA-certified windows resisting Category 5 debris impact, while Tampa inland projects achieve $300-$500/sf using cost-effective steel frame with standard Low-E glass.
These comprehensive estimates capture concrete ($175-$275/sf), MEP systems ($80-$130/sf), elevators ($300K/ea), and 30% soft costs (permits, engineering, impact fees), positioning contractors to maximize insurance recoveries through precise Xactimate line items post-hurricane claims.
Get a Quick
Estimate For Projects
Post-Surfside Florida Building Code Requirements
Senate Bill 4-D mandates $125-$225/sf safety upgrades—concrete spalling repairs ($30-$55/sf balconies x25% gross area), rebar assessment ($20/sf columns/beams), impact-rated glazing ($275-$475/sf), parking garage inspections ($2-$5/sf deck area). Reserve studies require 10-year replacement budgets $0.25-$0.60/sf/month funding. Pompano 15-story 120-unit structural upgrades total $18M-$32M (25% project), Phase 1 balconies prioritized Year 1-2 insurance claims.
Structural Concrete and Framing Costs
Cast-in-place 4,500 PSI concrete costs $175-$275/sf—8-10″ PT slabs ($125-$185/sf), 12-16″ shear walls ($225-$350/sf), drop panel transfers $400-$600/sf elevator pits. Balcony reconstructions $40-$65/sf cantilevered (post-tension tendons $15/sf), PTI slabs +15% premium spans. Elevator core formwork $500-$750/sf specialized. 150-unit Tampa mid-rise concrete totals $72M-$108M (55% hard costs), FBC Chapter 19 corrosion inspection mandatory.
Impact Glazing and Storefront Systems
Miami-Dade NOA laminated glass $275-$500/sf installed—6’x10′ missile-rated $20K-$35K/unit (100 windows avg), fixed spandrel $225-$350/sf opaque, terrace doors $18K-$28K/ea x48. Pompano coastal 200-unit tower glazing $22M-$40M (18% budget), argon Low-E U-0.35 mandatory energy code. Inland Orlando double-pane $150-$275/sf saves $125/sf.
Get High-Quality 3D Rendering Services Today!
Transform your space with stunning 3D Rendering that blends style, comfort, and functionality.
We Specialize in Both Residential and Commercial 3D Rendering Projects.
- Luxury Villas
- Apartment Complexes
- Home
- Condominium
- Office Buildings
- Shopping Malls
- Hospitals
- Hotels & Resorts
MEP Infrastructure Replacement
Variable refrigerant HVAC $12-$20/sf 4-pipe, sprinklers NFPA 13R $9-$15/sf residential floors, 400A metering $30K/bank, pool systems $450K-$750K. Standby generators 750kW $650K-$950K high-rise, smoke control $20/sf stair towers. Fort Lauderdale 18-story MEP $25M-$42M (22% costs), FPL Time-of-Use rates optimized.
Vertical Circulation and Elevators
Gearless traction elevators $300K-$550K/ea (2,500 lb, 550 fpm), cab interiors $75K-$150K luxury, MRL gearless +25%. 12-story 4-car bank $1.6M-$2.8M, 6-story hydraulic $1M-$1.6M. ASME A17.1 FBC inspections $20K/year, 3-hour hoistways $85/sf shaft walls.
Fire and Life Safety Systems
2-hour corridor assemblies $50-$85/sf—Type X 5/8″ + resilient channels STC 50, fire-rated storefront $75/sf vision, sprinkler standpipes $18K/floor. Smoke dampers $2.5K/ea x75, rated door hardware $4K/ea x60/floor. Miami Beach 20-story fire systems $15M-$25M (12% total).
Regional Florida Condo Cost Variations
City | Mid-Rise/sf | High-Rise/sf | Coastal Premium |
Miami Beach | $475-$725 | $575-$875 | +40% |
Hollywood | $425-$675 | $525-$775 | +30% |
Pompano Beach | $400-$650 | $500-$750 | +25% |
Fort Lauderdale | $375-$625 | $475-$725 | +20% |
West Palm | $350-$600 | $450-$700 | +15% |
Tampa | $325-$575 | $425-$675 | +8% |
Sarasota | $300-$550 | $400-$650 | Baseline |
Jacksonville | $275-$525 | $375-$625 | -10% |
Pompano 12-story 100-unit: $55M-$85M ($450-$700/sf avg unit).
90% More Chances to Win Bids with
Our Estimate!
Soft Costs and Development Overheads
28-38% total—geotechnical $75K borings, civil/site $3-$6/sf, architectural 7-12%, FBC permitting $1.50-$3/sf high-rise, impact fees $18K-$25K/unit coastal. Construction manager 5-8%, performance bonds 1-2%, HOA legal 1.5%. 200-unit soft costs $35M-$65M land excluded.
Sample Condo Replacement Projects
Pompano 15-Story 120-Unit Mid-Rise (1,500 sf avg):
Concrete frame: $81M ($450/sf x180K sf)
Impact glazing: $24M ($133/sf)
MEP complete: $27M ($150/sf)
Elevators (4): $1.6M
Fire/life safety: $13.5M ($75/sf)
Soft costs (32%): $47.5M
**Total: $194.6M ($1.62M/unit, $1,093/sf gross)**
Tampa 8-Story 80-Unit (1,600 sf avg):
Concrete structure: $41M ($385/sf)
Glazing standard: $12.8M ($120/sf)
MEP systems: $17.6M ($165/sf)
Elevators (3): $1.1M
**Hard Costs: $72.5M**
Soft (28%): $20.3M
**Total: $92.8M ($1.16M/unit, $812/sf)**
Insurance Replacement vs Market Value
Replacement Cost Value (RCV) $450-$650/sf concrete towers, Actual Cash Value (ACV) deducts 25-45% depreciation. Post-Surfside precedent $525/sf minimum mid/high-rise. Market gap 20-30%—Pompano resale $375-$525/sf vs replacement.
HOA Funding and Special Assessments
SB 4-D reserves $0.30-$0.70/sf/month—$50K-$150K/unit assessments balcony/window packages. FEMA 75% non-insurable upgrades, bridge loans 70% LTC replacement basis 18-month term.
Phased Reconstruction Timeline
Phase 1 (Months 1-12): Balconies/parking $15-$25M (25%)
Phase 2 (13-24): Windows/roof $20-$30M (30%)
Phase 3 (25-48): Core structure $30-$45M (40%)
Phase 4 (49-60): MEP finishes $10-$15M (15%)
5-year program $3M-$6M/month draw schedule.
Cost Reduction Strategies
- Steel frame vs concrete interior bays (save 12%)
- Generic NOA glass vs custom (save $100/sf)
- Staggered floor completion (15% overhead)
- Temporary power skips full MEP Year 1 (20%)
Want to Start Your Project with the Best Contractors?
Let’s Take Your Projects to the Next Level.
& What's you will get:
- Connecting You to Top Local Contractors
- Professional Consulting, Contractors Near You
- From Expert Advice to Local Contractor Connections
Contact Now
Let's discuss with a cup of coffee
Accurate Condo Replacement Estimating
Estimate Florida Consulting delivers FBC-compliant condo replacement estimators for Pompano HOAs navigating insurance claims and special assessments. Upload as-builts to
or call 561-530-2845 for engineered bids within 72 hours.
Frequently Asked Question
In 2026, full condo replacement costs in Florida typically range from $325 to $575 per square foot. Coastal high-rise buildings can exceed $725 per square foot due to HVHZ wind engineering, impact glazing, and post-Surfside structural mandates.
A standard 1,400–1,800 sq ft 2BR/2BA unit generally costs between $455,000 and $1.04 million, depending on location, building height, and structural requirements.
Coastal premiums (20%–40%) are driven by Miami-Dade HVHZ requirements, impact-rated NOA windows, salt-air corrosion protection, epoxy-coated rebar, and Category 5 wind resistance engineering.
Post-Surfside legislation (SB 4-D) added $125–$225 per square foot in mandatory safety upgrades, including balcony reconstruction, structural inspections, rebar assessments, and enhanced reserve funding.
Structural concrete costs typically range from $175 to $275 per square foot, with shear walls, elevator cores, and post-tension slabs adding significant premiums in mid- and high-rise buildings.
Comprehensive Trade-Specific Estimates
At Estimate Florida Consulting, we offer detailed cost estimates across all major trades, ensuring no part of your project is overlooked. From the foundation to the finishing touches, our trade-specific estimates provide you with a complete and accurate breakdown of costs for any type of construction project.
Our Simple Process to Get Your Estimate
Upload Plans
Submit your project plans, blueprints, or relevant documents through our online form or via email.
Receive Quotation
We’ll review your project details and send you a quote based on your scope and requirements.
Confirmation
Confirm the details and finalize any adjustments to ensure the estimate meets your project needs.
Get Estimate
Receive your detailed, trade-specific estimate within 1-2 business days, ready for your project execution.
Our Clients & Partners
We pride ourselves on building strong, lasting relationships with our clients and partners across the construction industry.
What Our Clients Say?
We take pride in delivering accurate, timely, and reliable estimates that help contractors and builders win more projects. Our clients consistently praise our attention to detail, fast turnaround times, and the positive impact our estimates have on their businesses.
Estimate Florida Consulting has helped us win more bids with their fast and accurate estimates. We trust them for every project!