- Homepage
- How to Estimate Multi-Family Apartment Paintin?
How to Estimate Multi-Family Apartment Painting?
Leading provider of painting estimating services.
Estimating multi-family apartment painting by unit streamlines bidding for large complexes, allowing contractors to quickly scale costs for 50, 200, or 500 units while accounting for economies of scale, building conditions, and Florida-specific factors like humidity and hurricane resilience. This method breaks down interiors and exteriors into repeatable per‑unit templates, making it easier to adjust for unit types (1‑bed, 2‑bed) and site logistics.
Why Estimate by Unit?
Multi-family projects involve hundreds of similar spaces, so unit‑based estimating saves time and improves accuracy compared to measuring every wall or balcony individually. Owners and property managers appreciate bids presented as “per unit” or “per building” with clear assumptions, making it simple to compare bids and understand total costs.
- Interior: Standardize by bedroom count (1BR = 800 sq ft paintable, 2BR = 1,100 sq ft) to price turnovers or full repaints.
- Exterior: Use “per unit” for balconies, entries, and shared walls, scaled by stories and building type (garden‑style vs. mid‑rise).
This approach also helps forecast crew productivity, material waste, and phasing across buildings or phases.
Step 1: Gather Unit Data and Site Information
Start with detailed unit layouts, floor plans, and elevation drawings. If available, request as‑built drawings or recent condition reports to identify high‑maintenance areas like balconies or soffits.
Key data to collect:
- Unit mix: Number of 1BR, 2BR, 3BR units; total units and buildings.
- Interior finish schedule: Wall types (drywall, textured), ceilings (acoustic drop vs. exposed), trim details, and cabinetry.
- Exterior conditions: Siding material (stucco, Hardie, EIFS), balcony railings, entry doors, and common areas like breezeways.
- Scope type: Turnover (vacant units), occupied repaints, or full complex exterior.
Site visit to photograph 2–3 sample units and note variations like upgraded finishes or damage from tenant wear.
Get High-Quality 3D Rendering Services Today!
Transform your space with stunning 3D Rendering that blends style, comfort, and functionality.
We Specialize in Both Residential and Commercial 3D Rendering Projects.
- Luxury Villas
- Apartment Complexes
- Home
- Condominium
- Office Buildings
- Shopping Malls
- Hospitals
- Hotels & Resorts
Step 2: Develop Per-Unit Takeoff Templates
Create standardized templates for interior and exterior work, based on average sizes from Florida multi-family projects.
Interior Per-Unit Breakdown
Unit Type | Paintable Walls (sq ft) | Ceilings (sq ft) | Trim (LF) | Doors/Windows | Total Paint Area |
1BR (800 sf) | 650 | 250 | 150 | 4 doors/6 windows | 900 sf |
2BR (1,100 sf) | 900 | 350 | 200 | 5 doors/8 windows | 1,250 sf |
3BR (1,400 sf) | 1,150 | 450 | 250 | 6 doors/10 windows | 1,600 sf |
- Subtract 15–20% for closets, cabinets, and fixtures.
- Add 10% waste for textured walls or spray application.
Exterior Per-Unit Components
Component | Average per Unit | Notes |
Balcony/Railings | 50–100 sf / 40 LF | Stucco or metal, rust treatment |
Entry Door/Frame | 20 sf / 10 LF | Semi-gloss, high durability |
Shared Walls/Soffits | 200–300 sf | Pro-rated by floors/units |
For a 100‑unit garden‑style complex: ~25,000 sf exterior walls + 5,000 sf balconies = $0.33–$0.66/sf total ~$10,000–$20,000.
Step 3: Surface Preparation by Unit
Prep varies by condition: turnovers need light cleaning vs. full repaints requiring scraping and priming.
- Interior: Patch holes ($2–$4/unit), clean/sand ($50–$100/unit), prime spotty areas (1 gal/10 units).
- Exterior: Pressure wash ($0.10–$0.20/sf), caulk joints (0.5 gal/50 units), repair stucco/cracks ($5–$15/unit).
Florida humidity adds mildew treatment: biocides at $0.05/sf exterior.
Step 4: Material Quantities and Costs
Paint coverage: 350–400 sf/gal per coat; 2 coats standard.
Interior Materials (Per 2BR Unit)
- Primer: 0.3 gal @ $25/gal = $7.50
- Topcoat: 0.7 gal @ $35/gal = $24.50
- Tape/Supplies: $10
- Total Materials: $42/unit
Scale: 100 units = 70 gal primer, 170 gal topcoat.
Exterior (Per Unit)
- Elastomeric primer/topcoat: 0.5 gal @ $50/gal = $25
- Caulk/Sealant: $5
- Total: $30/unit
Step 5: Labor Productivity and Crew Sizing
Base rates on Florida market: $2–$4/sf interior, $1.50–$3/sf exterior.
- Interior Turnover: 2 painters/unit/day @ $50/hr = $400 labor (includes prep/paint).
- Exterior: Swing stages or lifts; 500 sf/day/team @ $2.50/sf = $1,250/day for 10 units.
Phasing: 20% time for mobilization, 10% cleanup. Overtime for occupied buildings.
90% More Chances to Win Bids with
Our Estimate!
Step 6: Access, Safety, and Logistics Costs
Multi-family exteriors need scaffolding ($0.50/sf), lifts for balconies ($200/day), and protection for residents ($5/unit).
Interiors: Dust barriers ($20/unit), resident notifications, vacancy coordination.
Step 7: Overhead, Profit, and Contingencies
- Overhead: 15–20% (insurance, supervision, equipment).
- Profit: 10–15%.
- Contingency: 5–10% for repairs/weather.
Sample Per-Unit Bid Summary
Category | 1BR Interior | 2BR Interior | Exterior/Unit |
Prep | $75 | $100 | $50 |
Materials | $35 | $42 | $30 |
Labor | $300 | $400 | $250 |
Access/Overhead | $50 | $60 | $100 |
Total/Unit | $460 | $602 | $430 |
For 200‑unit complex: $220K interior + $86K exterior = $306K total.
Scaling for Complex Size and Condition
- 50 units: Higher per‑unit ($0.60/sf) due to fixed mobilization.
- 500 units: $0.40/sf with efficiencies.
Adjust +20% poor condition, -10% new builds.
Florida-Specific Considerations
Humidity requires mildew‑resistant paints (+10% material); hurricane codes add soffit/trim durability.
Phasing and Scheduling
Bid by building/phases: 25 units/week, tenant coordination for occupied.
Common Pitfalls and Fixes
- Underestimating trim/doors: Add 20% buffer.
- Waste on small units: Template averages smooth it.
Winning Multi-Family Bids
Present per‑unit pricing with photos, samples, and warranties.
Estimate Florida Consulting specializes in multi-family apartment painting estimates by unit, helping contractors scale bids accurately. Years of experience ensure 1-2 day turnarounds—upload plans to
or call 561-530-2845.
Want to Start Your Project with the Best Contractors?
Let’s Take Your Projects to the Next Level.
& What's you will get:
- Connecting You to Top Local Contractors
- Professional Consulting, Contractors Near You
- From Expert Advice to Local Contractor Connections
Contact Now
Let's discuss with a cup of coffee
Frequently Asked Question
The most accurate approach is unit-based estimating, where costs are calculated per apartment unit instead of measuring every wall individually. This method improves accuracy, speeds up bidding, and allows contractors to scale estimates efficiently for complexes with 50, 200, or even 500 units.
Multi-family buildings contain repetitive layouts, so per-unit estimating captures labor, material, and productivity averages more effectively. Square-foot pricing often overlooks trim, doors, balconies, and access challenges, leading to underpriced bids.
Paintable area is calculated using standardized averages by unit type:
1BR units: ~800 sq ft paintable area
2BR units: ~1,100 sq ft paintable area
3BR units: ~1,400 sq ft paintable area
Closets, cabinets, and fixtures are typically deducted by 15–20%, with an added 10% waste factor for textured walls or spray application.
Exterior costs are broken down per unit for:
Balconies and railings
Entry doors and frames
Shared walls, soffits, and breezeways
These elements are then scaled based on number of floors, building type, and access requirements such as lifts or scaffolding.
Prep work varies by condition but typically includes:
Interior patching, sanding, and spot priming
Exterior pressure washing, caulking, and crack repairs
Mildew treatment in humid climates
Failing to include prep costs is one of the most common causes of underestimated bids.
Comprehensive Trade-Specific Estimates
At Estimate Florida Consulting, we offer detailed cost estimates across all major trades, ensuring no part of your project is overlooked. From the foundation to the finishing touches, our trade-specific estimates provide you with a complete and accurate breakdown of costs for any type of construction project.
Our Clients & Partners
We pride ourselves on building strong, lasting relationships with our clients and partners across the construction industry.
What Our Clients Say?
We take pride in delivering accurate, timely, and reliable estimates that help contractors and builders win more projects. Our clients consistently praise our attention to detail, fast turnaround times, and the positive impact our estimates have on their businesses.
Estimate Florida Consulting has helped us win more bids with their fast and accurate estimates. We trust them for every project!
Our Simple Process to Get Your Estimate
Upload Plans
Submit your project plans, blueprints, or relevant documents through our online form or via email.
Receive Quotation
We’ll review your project details and send you a quote based on your scope and requirements.
Confirmation
Confirm the details and finalize any adjustments to ensure the estimate meets your project needs.
Get Estimate
Receive your detailed, trade-specific estimate within 1-2 business days, ready for your project execution.